Approximately 50 trucks were required to deliver the volume of concrete for this single pour to the south sector of the Level 1 floor slab.

Click on the images for larger resolution.


The above image describes the extent of today's concrete pour. This volume represents approximately 1/10th of the total insitu concrete required for the project.