Rob keeping tabs on the structural reinforcing.
Wayne setting out the fire detection componentry prior to the slab pour.
Colin installing the hydraulic pipework for the sanitary facilities.
Colin demonstrating how sections of the pipework are fixed together using a low voltage electric current.
No comments:
Post a Comment