Formwork scaffolding is being installed at the southern end of the site.
The Papal Triumvirate - Paul, John and Leo conduct a walk through of the site.
Project Control Group Meeting 02.
Draft sequencing programme for the concrete slab pours.

The larger of the two lift pits.