Friday, July 18, 2008

Week 11 continued ...

Formwork scaffolding is being installed at the southern end of the site.

The Papal Triumvirate - Paul, John and Leo conduct a walk through of the site.

Project Control Group Meeting 02.

Draft sequencing programme for the concrete slab pours.

The larger of the two lift pits.