 Formwork scaffolding is being installed at the southern end of the site.
 Formwork scaffolding is being installed at the southern end of the site. The Papal Triumvirate -  Paul, John and Leo conduct a walk through of the site.
The Papal Triumvirate -  Paul, John and Leo conduct a walk through of the site.
 Project Control Group Meeting 02.
 Project Control Group Meeting 02. Draft sequencing programme for the concrete slab pours.
 Draft sequencing programme for the concrete slab pours.

The larger of the two lift pits.
 